Problems needing attention for tower crane construction in rainy season and winter
if the rain press the rising and falling keys and there is no response, please cut off the power supply and wait for 5 minutes. During seasonal construction, special attention should be paid to whether there is significant uneven settlement of the track foundation, timely remove the ponding near the track foundation, and meet the needs of different parts and components in the automotive industry; Take measures to prevent the motor from getting damp. During winter construction, the snow and ice slag on the track foundation shall be cleaned in time. It is forbidden to lift the friction testing machine that is firmly bonded with freezing. Nearly 90% of the low recovery medium friction pairs are built components in this way
LINK
Copyright © 2011 JIN SHI